Flagship project
Powering Albania's Future: Feasibility Study for the 1200 MW Moglice Hydro Plant
GOPA Tech undertook a comprehensive power system study for the PS Moglice Extension in Albania, focusing on the feasibility of a 1200 MW pump storage hydro plant. This pivotal study encompasses several critical aspects, including transmission grid modeling, grid reinforcement planning, and dynamic stability analysis, with the primary objective of ensuring the stable integration and operation of this substantial hydro power facility within Albania's existing power network.